Writing Tool and Worldbuilding Workspace

ContentCraft for writers, worldbuilders, and game masters

Your world should get richer the longer you work on it — not harder to keep straight.

ContentCraft is for writers, worldbuilders, and game masters whose projects outgrew memory and outgrew folders. Your project lives in one place, so the next chapter can build on what you have already established.

ContentCraft project dashboard showing a worldbuilding and writing workspace for characters, lore, notes, and continuity planning
See the workspace

A real ContentCraft project dashboard, with lore, notes, timeline, and canon surfaces organized for long-form creative work.

What it is

Every writer or game master with a project worth finishing runs into the same wall. The story gets bigger than memory can hold, and the world starts to drift. A faction's motives shift between chapters. A character says the wrong name. The bustling port town on page forty is a sleepy village by page two hundred. ContentCraft is built for that moment — when you want the project to keep growing without the continuity giving out.

This is a workspace where the people, places, factions, timelines, and rules of your world live together and stay connected. You write with your canon in reach instead of trying to keep the whole project in your head.

The writers and game masters who fit best here are the ones building something they want to return to: a novel that needs a second book, a campaign that runs for a year, a setting that outlives the first thing you wrote for it.

Who it is for

Writers and novelists working on projects that span multiple chapters, books, or years — where readers will notice if the villain's backstory quietly shifts between volumes.

Worldbuilders whose settings have become the point of the project. Factions, geography, history, culture, technology. The kind of world a reader or player wants to step back into because it actually holds together.

Game masters running long campaigns with recurring NPCs, growing factions, and places the party keeps coming back to. Prep for session twelve should be easier than prep for session two, not harder.

Why long projects drift

Creative projects rarely fail in one dramatic moment. They fail in the slow drift of names, motivations, timelines, and rules that were supposed to stay fixed. By the time you catch the contradictions, untangling them costs more than writing the next chapter.

Generic AI tools make this worse, not better. They generate fast and forget everything. What a serious project needs is a workspace that keeps the project close at hand, so new material builds on what already exists instead of drifting away from it.

See ContentCraft in action

These product screenshots show the actual ContentCraft interface near the features and workflows they support.

ContentCraft project dashboard showing a worldbuilding and writing workspace for characters, lore, notes, and continuity planning
Start from a project dashboard built for writers and worldbuilders who need one place for lore, drafts, and continuity.
ContentCraft project screen showing AI-generated content cards, canon check status, and writing workflow controls
Review generated drafts beside project context so new material stays tied to the canon you already established.
ContentCraft canon library showing linked characters, factions, locations, and timeline entries for a creative writing project
Keep people, places, factions, and timeline events in a searchable canon library instead of scattered notes.
ContentCraft timeline screen showing story continuity planning for a worldbuilding project
Track major lore events in sequence so the project keeps its internal logic as it grows.
ContentCraft draft notes screen showing project notes for revision questions and worldbuilding continuity
Use draft notes to park revision questions, worldbuilding reminders, and continuity checks without leaving the workspace.

How it works

  1. Bring in the project you are already working on. The characters that matter, the places the story keeps returning to, the factions whose choices drive the plot, the rules the world is supposed to follow.
  2. Write using that canon. Draft, review, and revise in the same workspace where your project already lives, with AI help available when you want it and out of the way when you do not.
  3. Add new canon as the project grows. The project gets richer over time instead of harder to manage, and the next chapter inherits everything the last one established.
  4. For setup steps, project templates, and detailed workflows, see the help pages and the articles on building a campaign bible, keeping recurring elements consistent, and moving from notes to usable session content.

Key features

Projects and shared library

Keep campaigns, settings, chapters, articles, and supporting canon in one workspace instead of splitting them across unrelated tools.

Canon and continuity tracking

Track characters, locations, items, factions, arcs, timelines, and references so story details stay consistent over time.

Draft in deliberate steps

Move from outline to draft to review at your own pace instead of handing the whole project to a single prompt.

Relationship mapping

Keep people, places, groups, and plot threads connected so the world feels coherent instead of scattered across disconnected notes.

Catch contradictions early

Review new material against the existing canon before it becomes settled so inconsistencies get caught while they are still easy to fix.

Export without losing history

Keep track of what changed without losing earlier draft decisions.

Pricing and access

ContentCraft is $9.99 per month or $99 per year. It is the one product in the Sixsmith Games lineup that requires a subscription from the start — the whole workspace comes together only when the canon, the project structure, and the drafting tools are in the same place.

AI assistance is included, but the real value is the world you build inside the workspace. The AI helps when you want it. The canon, the connections, and the project memory are yours whether you use the AI features or not.

Review ContentCraft pricingRead ContentCraft help

Frequently asked questions

What is ContentCraft?

ContentCraft is a writing tool and worldbuilding workspace for projects that need canon continuity. ContentCraft helps writers and game masters keep characters, locations, factions, lore, and timelines organized in one place.

Who is ContentCraft for?

ContentCraft is for writers, novelists, worldbuilders, and game masters. ContentCraft is not generic productivity software. It is built for projects where connected lore, story organization, and continuity matter.

Does ContentCraft replace my normal writing workflow?

ContentCraft is built around complex creative work, not a flat generic editor. It works best when the project needs a real canon layer, connected lore, and a way to review new material against what already exists.

How does ContentCraft help with canon continuity?

ContentCraft keeps core world details in a shared library and ties new work back to what the project has already established. That makes it easier to keep names, places, relationships, and rules consistent as the project grows.

Is AI required to use ContentCraft?

No. ContentCraft includes AI-assisted drafting, but the value goes beyond AI. The product is also about organization, canon continuity, review flow, and keeping creative work coherent.

How does pricing work for ContentCraft?

ContentCraft is $9.99 per month or $99 per year. The subscription includes some built-in AI usage, with additional AI usage handled through bring-your-own or purchased credits when needed.

Official links

ContentCraft pricing

See current pricing and how to get started with ContentCraft.

Try ContentCraft

Open the official ContentCraft app or play experience.

ContentCraft help

Read getting-started notes, core features, common use cases, and current scope for ContentCraft.

Support and contact

Reach the Sixsmith Games support team for help, product questions, and contact details.

Helpful guides

What Is ContentCraft?

ContentCraft is a writing tool and worldbuilding workspace for projects that need lore organization, canon continuity, and a structured way to develop material over time.

How to Keep Lore Consistent in a Long Campaign or Novel

Lore stays consistent when characters, factions, locations, and timelines live in one organized place instead of scattered notes.

Worldbuilding Workflow for Writers and Game Masters

A strong worldbuilding workflow starts with the canon assets the project must remember, then expands through reviewable steps.

Related products

Related product